Technial Requirements
♦ Before assembling, all parts will be cleaned, no oil or grease, remove all burrs and sharp edges.
♦ Before connecting, body cap male thread should be coated with sealing glue
♦ Handle turn or close freely.
♦ After assembling, all the goods test by water at pressure no less than 0.8MPA, no leakage.
Standard:ISO9001 Number:CN4685-QC Issue Date:2020-06-03 Expiry Date:2023-06-03 Scope/Range:Valves production Issued By:TQCSI |
Standard:CE Number:0P200907.ZYVCO83 Issue Date:2020-09-07 Expiry Date:2025-09-06 Scope/Range:Ball valve Issued By:ECM |
Standard:CE Number:ISETC.001120200413 Issue Date:2020-04-13 Expiry Date:2025-04-12 Scope/Range:Ball Valve Issued By:ISET S.R.L |
Contact Person: Miss. Zhao
Tel: +8615268887611
Fax: ZHE JIANG YALONG VALVES CO.,LTD